A proven track record of delivering complex contracts across multiple federal agencies and states.
Comprehensive grounds maintenance for the Carl Vinson Veterans Affairs Medical Center campus. Year-round services include mowing, edging, seasonal planting, mulching, leaf removal, irrigation management, and winter weather preparation. This multi-year contract demonstrates A5N Prime's ability to deliver consistent, high-quality grounds care that maintains the dignity and appearance of a facility serving our nation's veterans.
Portable 550-ton chiller rental (contract 36C24726P0538) supporting cooling capacity at the Carl Vinson Veterans Affairs Medical Center. Scope includes equipment delivery, rigging, temporary piping connections, commissioning, and demobilization. Coordinated with hospital facilities operations to ensure zero disruption to patient care throughout the rental period.
Sod procurement and delivery at the Florida National Cemetery in Bushnell, FL. A5N sourced and delivered 396 pallets of turf across two species, 300 pallets of St. Augustine and 96 pallets of Bermuda, scheduling deliveries against the cemetery’s active interment calendar. Scope included material sourcing, freight coordination, and delivery scheduling around the cemetery’s active operations, in support of a national shrine honoring America’s veterans.
Awarded under an SDVOSB set-aside before A5N Prime’s own certification was finalized and performed under a predecessor entity by the same principals. A5N Prime carries forward the same leadership, capability, and performance history.
Five-year recurring trim and edge services at Massachusetts National Cemetery for the Department of Veterans Affairs National Cemetery Administration (NCA). Awarded 2026, with performance beginning July 2026. Continues A5N Prime's track record of dependable, recurring grounds maintenance for federal customers under the exacting standards required of a national cemetery honoring America's veterans.
HVAC system installation, repair, and preventive maintenance at multiple USCG installations across the Northeast District. Work includes rooftop unit replacement, ductwork modification, and building automation integration.
Electrical infrastructure projects at USCG facilities including panel upgrades, lighting systems, power distribution, and code compliance work to support Coast Guard operations and personnel safety.
Multiple construction and renovation projects at USCG installations including basketball court construction for personnel recreation, security gate installation and replacement, and perimeter fencing for base security and access control.
Replacement of exterior and interior door systems at U.S. Coast Guard Station New Haven under purchase order 70Z05226PCCOD0136. Scope includes removal of existing units, frame and hardware replacement, and installation of code-compliant door assemblies at an operational Coast Guard station. Fully funded award primed by A5N Prime LLC.
Five-year grounds maintenance contract at the Fort Des Moines U.S. Army Reserve Center (IA033) under the Army Mission and Installation Contracting Command (MICC), contract W911SA-25-Q-A042. Primed by A5N Prime LLC. Scope includes mowing, edging, turf management, and seasonal grounds care across an active Army Reserve installation in central Iowa.
Floor replacement in an active video teleconference facility at Fort Devens, Massachusetts under contract W15QKN-26-P-A060. Scope includes demolition of existing flooring, substrate preparation, and installation of new finished flooring in a secured, operational facility, performed under a payment and performance bond. Primed by A5N Prime LLC.
Grounds maintenance services at the Naval Undersea Warfare Center in Newport, Rhode Island. Comprehensive facility grounds care at one of the Navy's premier research and development installations.
Interior flooring replacement in Building 1246 at the Naval Undersea Warfare Center, Newport, Rhode Island under contract N66604-26-P-0159. Scope includes removal and disposal of existing floor systems, substrate remediation and preparation, and installation of new flooring throughout an occupied Navy facility with phased work areas to maintain building operations. Primed by A5N Prime LLC.
Demolition of a decommissioned vessel hull positioned on land in a paved lot. Scope included sectioning the hull, hazardous material handling, environmental containment, loadout to flatbed transport, and site restoration. All work was performed on land. No in-water or over-water operations were involved.